top of page
Aluminum Warehouse

FACILITY DECOMMISIONING
PROJECT

ElkGrove-FacDecom-1.jpg

BEFORE

ELK GROVE, IL
FACILITY DECOMMISSIONING

PROJECT DETAILS:

Client handing over a facility in Elk Grove, IL

 

  • Electrical back to original
     

  •  Dismantle and recycle shelving and mezzanine systems. Remove interior stairwell with the use of a heavy duty reach lift and forklift to ensure safety and no damage to the flooring. - Disassemble and remove exterior stairwell with the use of a heavy duty reach lift and forklift to ensure safety and no damage to the exterior of the building or the asphalt.  
     

  •  Masonry - Remove 2nd level exit door - Cinder block and finish to match surrounding inside area - Brick and mortar exterior to match as closely as possible existing brick
     

  • Electronic Waste - Source and recycle all electronic waste according local government guidelines

ElkGrove-FacilDecom-2.jpg

AFTER

bottom of page